Newman Ridge Project

6 Documents in Project

Summary

SCH Number
2011072039
Lead Agency
Amador County
Document Title
Newman Ridge Project
Document Type
NOD - Notice of Determination
Received
Posted
10/12/2012
Present Land Use
Currently used for open space, cattle grazing, and other agricultural uses.
Document Description
Use Permit and Reclamation Plan for Newman Ridge Quarry, a proposed andesite quarry on approximately 278 acres, with operations occurring on approximately 216 acres; And a General Plan Amendment to I, Industrial; Zone Change to "M", Manufacturing District; Use Permit for an asphaltic concrete (AC) plant; and Use Permit to exceed the maximum 45' height limit in the "M" zone district for the proposed AC plant and a ready-mix concrete plant to allow heights of approx. 72' and 49'. respectively for the Edwin Center North project planned to host various processing facilities, including an aggregate plant, an asphaltic concrete (AC) plant, ready-mix concrete plant, an asphalt and concrete recycling plant, and a rail load out facility for finished products, as well as ancillary administration and support facilities (e.g., fuel storage, truck scales, temporary construction trailer).

Contact Information

Name
Susan C. Grijalva
Agency Name
Amador County
Contact Types
Lead/Public Agency

Location

Cities
Ione
Counties
Amador
Cross Streets
Michigan Bar Road/Twin Cities Road
Zip
95640
Total Acres
391
Parcel #
005-080-014,015;005-090-012,016;005-110-010,011;005-120-008,010
State Highways
Hwy 104
Railways
UPRR
Airports
Ranch Airstrip
Waterways
Sutter Creek, Mule Creek, Loch Lane Lake
Township
6N
Range
9E
Section
21
Base
MDB&M

Notice of Determination

Approving Agency
County of Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print