Newman Ridge Project

6 Documents in Project

Summary

SCH Number
2011072039
Lead Agency
Amador County
Document Title
Newman Ridge Project
Document Type
FIN - Final Document
Received
Present Land Use
Currently used for open space, cattle grazing, and other agricultural uses.
Document Description
NOTE: Final 1 CD The proposed project consists of the following two components: 1) the Newman Ridge Quarry; and 2) the Edwin Center. The Newman Ridge Quarry is an andesite quarry on ~278 acres, with operations occurring on ~216 acres. The production level of the Quarry is anticipated to be 5 million tons per year, to be extracted over ~50 years, depending on market demand. Material would be processed at the on-site processing facilities and then trucked and/or conveyed from the Quarry along an existing haul road to the Edwin Center for further processing and transported off-site via haul truck or rail. The Edwin Center would host various material processing facilities on ~113 acres, including an aggregate processing plant, an asphaltic concrete plant, a ready-mix concrete plant, an asphalt and concrete recycling facility, and a rail loadout facility for finished products. Mining would not occur within the Edwin Center, which is geographically separate from the Quarry. The railroad loadout facility would be located directly off the existing Union Pacific-Ione Branch rail. The majority of material processed at the Edwin Center would be railed to regional markets. The remaining material would be trucked directly to customers in the local market of Ione and throughout Amador County.

Contact Information

Name
Heather Anderson
Agency Name
Amador County
Contact Types
Lead/Public Agency

Location

Cities
Ione
Counties
Amador
Cross Streets
Michigan Bar Road/Twin Cities Road
Zip
95640
Total Acres
391
Parcel #
005-080-014,015;005-090-012,016;005-110-010,011;005-120-008,010
State Highways
Hwy 104
Railways
UPRR
Airports
Ranch Airstrip
Waterways
Sutter Creek, Mule Creek, Loch Lane Lake
Township
6N
Range
9E
Section
21
Base
MDB&M

Notice of Completion

Development Types
Industrial (Acres 113), Mining (Mineral Andesite)
Local Actions
General Plan Amendment, Rezone, Use Permit, Reclamation Plan, Excessive Height Permit
Project Issues
Aesthetics, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Septic System, Transportation, Vegetation, Wetland/Riparian, Wildfire, Other

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print