San Leandro Creek Hazardous Tree Management Project

3 Documents in Project

Summary

SCH Number
2011052029
Lead Agency
Alameda County
Document Title
San Leandro Creek Hazardous Tree Management Project
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2011
Present Land Use
Z: Open Space GP: Resource Conservation
Document Description
The Alameda County Flood Control and Water Conservation District (District) proposes to prune 15 trees that otherwise would have been potential to fail or might have large limbs break and call, coppice 2 native trees that are in poor condition or at high risk of failing to allow them to re-sprout, and remove 17 hazardous trees that are in danger of falling due to decay, structural defects, and/or potential to fall in the wind. Native trees, saplings and habitat features retained on the project sites will be protected during these activities and debris will be recycled. The project is located at three sites within an approximately one-mile stretch of San Leandro Creek between Woodland Avenue and Macarthur Boulevard in the City of San Leandro on Alameda County Flood Control and Water Conservation District property. Site 1 is at Huff Avenue, on both banks of the Creek, Site 2 is at Cary Drive, on both banks of the Creek, and Site 3 is at St. Mary Avenue, on the north bank of the Creek.

Contact Information

Name
Jim Browne
Agency Name
Alameda County Flood Control & Water Conservation District
Contact Types
Lead/Public Agency

Location

Cities
San Leandro
Counties
Alameda
Cross Streets
Huff Ave, Cary Drive, St. Mary Avenue
Total Acres
2.5
State Highways
Hwy 880, 580
Schools
Bancroft MS
Waterways
San Leandro Creek, Lake Chabot
Township
2S
Range
3W

Notice of Determination

Approving Agency
Alameda County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print