Water Tank #7 Replacement

2 Documents in Project

Summary

SCH Number
2011052018
Lead Agency
Arcata, City of (City of Arcata)
Document Title
Water Tank #7 Replacement
Document Type
NOD - Notice of Determination
Received

Document Description
The City is proposing to replace an existing 150,000-gallon redwood water tank, known as Tank #7, with a new welded steel 150,000-gallon tank. The tank is located within the Arcata Community Forest 700 feet southeast of CA Avenue on an approximately 0.15 acre site. The existing tank, which was installed in 1976 and is in poor condition with the potential for structural failure, is being replaced as part the City's ongoing storage tank upgrade program. Failure of the existing tank would render 140 households without domestic water and fire service protection. The City considers this replacement a high priority. The project capacity will remain at 150,000-gallon capacity as this is adequate to supply water to the households served by the tank, and to provide adequate fire flow. The existing tank is approximately 36 feet in diameter and 20 feet high. The new tank will be 36 feet in diameter and 21.2 feet high. The base elevation the new tank will be at 535 feet. The tank will be finished in a dark green color, consistent with other City steel tanks.

Contact Information
Mark S Andre
City of Arcata
736 F Street
Arcata, CA 95521

707 822 8184

Location

Cities
Arcata
Counties
Humboldt
Cross Streets
CA Avenue and Dunbar Court
Parcel #
503-291-002
State Highways
Hwy 101
Railways
No
Airports
No
Schools
No
Waterways
Janes Creek
Township
6N
Range
1E
Section
27
Base
HB&M

Notice of Determination

Approving Agency
City of Arcata
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
City of Arcata Env. Services. Dept. 736 F Street Arcata, CA 95521

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No