SCH Number
2011052008
Lead Agency
East Bay Municipal Utility District (EBMUD)
Document Title
Mokelumne Coast to Crest Trail - Middle Bar Segment
Document Type
NOD - Notice of Determination
Received
Posted
6/30/2011
Present Land Use
Ag
Document Description
The proposed project will establish the MCCT Middle Bar segment located on the west slope of the Sierra Nevada in Calaveras County in Central California at an elevation range of ~600 to 1100 feet. Approximately half of the trail will be constructed on existing fire roads and primitive abandoned roads. The remainder of the trail segments will be constructed with a small trail dozer and/or work crews on undeveloped ground. Brushy vegetation will be cleared to a width ranging from 5-12 feet along the trail alignments and the constructed trail width with be 2-5 feet. Work crews using hand tools will be utilized and District staff will also use a Trail Cat dozer where feasible. The proposed trail segment with adjoining river access spurs will be single loop and leaves the potential for establishing a link to another MCCT segment to the east in the future. The proposed work is planned to start in Summer 2011 and the in-service date for the trail segment is anticipated to be in Fall/Winter 2012.

Contact Information

Name
Rick Leong
Agency Name
East Bay Municipal Utility District
Contact Types
Lead/Public Agency

Location

Counties
Calaveras
Cross Streets
Middle Bar Road
Total Acres
~200
Parcel #
016002006000
State Highways
Hwy 49
Waterways
Mokelumne River
Township
5N
Range
11E
Section
11
Base
MDB&M
Other Location Info
City/Nearest Community: Paloma

Notice of Determination

Approving Agency
East Bay Municipal Utility District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes