Coastal Treatment Plant Export Sludge Force Main Replacement

5 Documents in Project

Summary

SCH Number
2011051010
Lead Agency
South Orange County Wastewater Authority
Document Title
Coastal Treatment Plant Export Sludge Force Main Replacement
Document Type
NOD - Notice of Determination
Received
Posted
3/12/2013
Document Description
The proposed project involves construction of a Sludge Equalization Basin (EQB) at the Coastal Treatment Plant (CTP) in order to provide needed operational flexibility and reliability to meet treatment and recycled water goals. The EQB would extend sludge holding time and provide truck loading capability at the CTP by serving as the wet well for the new sludge export pump station and as emergency storage in the case of a pump or force main failure. The EQB is planned to be a circular reinforced concrete tank with a 41-foot outside diameter, a 22-foot inside wall height, and a height of 23.5 feet; the EQB would have a storage volume of 154,000 gallons. Associated facilities, including a masonry electrical building, sludge export pump, mixing/truck loading pump, and a ferric chloride pump, would also be constructed. The proposed project would not expand the existing capacity of the CTP.

Contact Information

Name
Brian Peck
Agency Name
South Orange County Wastewater Authority
Contact Types
Lead/Public Agency

Location

Cities
Laguna Niguel
Counties
Orange
Cross Streets
AWMA Road and Alicia Parkway
Zip
92677
Total Acres
15
Waterways
Aliso Creek, Sulphur Creek, Pacific Ocean
Township
7S
Range
8W
Other Location Info
City of Aliso

Notice of Determination

Approving Agency
Board of Directors of South Orange County Wastewater Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.