Expansion and Remodel of Chavez Elementary School

2 Documents in Project

Summary

SCH Number
2011031089
Lead Agency
Corona-Norco Unified School District (CNUSD)
Document Title
Expansion and Remodel of Chavez Elementary School
Document Type
NOD - Notice of Determination
Received
Posted
5/6/2011
Present Land Use
School
Document Description
Expansion and remodel of existing 13-acre K-6 elementary school into an approximate 34-acre comprehensive K-8 school to accommodate approximately an additional 500 students and 25 staff, which will be performed in phases to allow continued operation of the existing school campus during construction, and which will include: (1) placement of relocatable buildings for temporary classrooms, science lab, locker rooms, and restrooms; (2) rough grading of new building pads and future playfields and construction of two permanent classroom buildings, kitchen building, multi-purpose building, gymnasium building, administration and media center building, two shade shelters, vehicle access road, small parking lot, athletic fields, and hardcourt play areas; (3) remodel of existing administration building into band and drama building, (4) relocation of temporary locker rooms; and (5) removal of temporary classrooms, science lab, remodeled band and drama building, and existing multi-purpose building, steel lunch shelter, and hardcourt play areas.

Contact Information

Name
Donald Lussier
Agency Name
Corona-Norco Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Corona
Counties
Riverside
Cross Streets
Paseo Grande south of Pine Crest Drive
Zip
92882
Total Acres
21
Parcel #
102-160-001
State Highways
Hwy 91
Railways
Atchison Topeka & Santa Fe
Airports
Corona Municipal
Schools
Coronita ES
Waterways
Wardlow Wash
Township
3S
Range
7W
Section
33,34
Base
SBB&M

Notice of Determination

Approving Agency
Corona-Norco Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print