City of Galt Live Oak Pump Station (pump station) and Force Main Project

3 Documents in Project

Summary

SCH Number
2011012012
Lead Agency
City of Galt
Document Title
City of Galt Live Oak Pump Station (pump station) and Force Main Project
Document Type
NOD - Notice of Determination
Received
Posted
11/7/2011
Present Land Use
Rural Residential, Agriculture
Document Description
The construction and operation of new wastewater collection infrastructure to replace aging infrastructure, increase system reliability, and meet projected growth demands associated with buildout of the 2030 Galt General Plan. The project involves construction of a new pump station and ancillary facilities and installation of approximately 1,800 feet of 16-inch diameter force main and approximately 1,800 feet of 30-inch diameter gravity sewer pipeline. Both of these pipelines would connect the existing LOPS with the proposed pump station further west at 10065 Live Oak Avenue. Additionally, the project includes installation of approximately 12,800 feet of 24-inch diameter force main connecting the proposed pump station to the Galt Wastewater Treatment Plant at 10059 Twin Cities Road. The proposed pump station would be a wet well type pump station with four submersible pumps for a total ultimate capacity of 14.1 MGD. The existing Live oak pump station and 16-inch force main that runs from the existing LOPS along McFarland Street/UPRR tracks all the way to the WWTP will be rehabilitated in order to provide system redundancy (back up) for the new system; the pipeline will be retrofitted to include 9,900 feet of lining.

Contact Information

Name
Sandra Kiriu
Agency Name
City of Galt, Planning Department
Contact Types
Lead/Public Agency

Location

Cities
Galt
Counties
Sacramento
Cross Streets
Live Oak Avenue and McFarland Street
Zip
95667
State Highways
Hwy 99
Railways
UPRR
Waterways
Deadman Gulch

Notice of Determination

Approving Agency
City of Galt
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print