Castaic Conduit Bypass Pipeline

2 Documents in Project

Summary

SCH Number
2011011055
Lead Agency
Castaic Lake Water Agency
Document Title
Castaic Conduit Bypass Pipeline
Document Type
NOD - Notice of Determination
Received

Document Description
Castaic Lake Water Agency's (CLWA) two existing treatment plants, the Earl Schmidt Filtration Plant and the Rio Vista Water Treatment Plant, are connected through a series of transmission mains. The majority of these transmission mains are 54 inches in diameter and larger. However, an approximately 7,565-foot portion of the existing transmission system, known as the Castaic Conduit Pipeline, is only 39 inches in diameter and reduces to 36 inches before connecting to another 54-inch pipeline. This portion of the pipeline has historically caused reduced water pressure in portions of the transmission main system. Construction of the proposed Castaic Conduit Bypass Pipeline (Project) would eliminate this constriction by bypassing narrower sections of the pipeline with a new 54-inch-diameter pipeline connecting the existing larger sections. The pipeline would remedy low water pressure issues with turnouts in the Project vicinity, but would not increase the amount of water delivered to the turnouts or to the service area as a whole.

Contact Information
Jeff Ford
Castaic Lake Water Agency
27234 Bouquet Canyon Road
Santa Clarita, CA 91350

661 297 1600

Location

Coordinates
36°29'10"N 118°33'56"W
Cities
Santa Clarita
Counties
Los Angeles
Cross Streets
Newhall Ranch Road and Ave Tibbetts
Zip
91355
Total Acres
3.6
Parcel #
Numerous
State Highways
I-5/SR-126
Schools
Valencia HS/Bridgeport
Waterways
Santa Clara River/San Franciquito Creek
Base
SB

Notice of Determination

Approving Agency
Castaic Lake Water Agency
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
27234 Bouquet Canyon Road Santa Clarita, CA 91350

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes