Water Storage Reservoir Replacement Project

3 Documents in Project

Summary

SCH Number
2011011002
Lead Agency
Lake Arrowhead Community Services District
Document Title
Water Storage Reservoir Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
5/16/2011
Document Description
The 2008 Water Facilities Master Plan study determined that certain improvements were needed to components of the District's potable water infrastructure. Many water reservoirs in the District's water system were found to be in need of seismic retrofits due to concerns over structural integrity, particularly during a major regional seismic event. The study concluded that the Brentwood Reservoir, Mitlry Reservois, Shasta Reservoir and Beniff Reservoir, did not met modern earthquake standards. The District determined that the most economical way to ensure the reservoirs at the aforementioned sites have the structural integrity to withstand most strong earthquakes over the long term would be to replace the reservoirs with new reservoirs with new reservoirs that met all applicable standards. Recognizing the need for more storage to meet the needs of existing development and offering options in light of the area's water supply uncertainty, the District has concluded that, in additions to providing replacement with enhanced structural integrity, expanding the storage capacity of the replacement reservoir is.

Contact Information

Name
Ryan Gross
Agency Name
Lake Arrowhead Community Services District
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino
Cross Streets
Brentwood Drive, Shasta Drive, Mittry Drive and Baniff Drive
Zip
92352
State Highways
Hwy 18 and 173
Railways
no
Airports
no
Schools
no
Waterways
Lake Arrowhead
Township
2N
Range
3W
Section
11,17,
Base
SBB&M
Other Location Info
City/Nearest Community: Lake Arrowhead
Other Information
Section: 22

Notice of Determination

Approving Agency
Lake Arrowhead CSD
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print