San Diego Creek Restoration Project

3 Documents in Project

Summary

SCH Number
2010111042
Lead Agency
City of Irvine
Document Title
San Diego Creek Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2012
Present Land Use
Recreation/Recreation
Document Description
The project is limited to restoring a 1,971 meter (1.2 mile) portion of the San Diego Creek to original design grade and capacity as constructed in 1988. The City of Irvine proposes to accomplish this by: removing silt to design grade; removing trash, debris, and vegetation from the channel bottom; and realigning and/or replace existing riprap around outlet structures, grade control structures, and under bridges. The one time, initial construction intends to remove 0.14 acres of riparian vegetation. No new structures beyond that of the original 1988 construction are proposed. The repair of outlet structures, grade control structures, and restoration of the eroded soil-cement banks and access ramps will consist of the same type of material, in the same location, as originally designed. The project includes ongoing maintenance of the channel and existing structures throughout the term of the Agreement.

Contact Information

Name
Kevin Hupf
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Irvine
Counties
Orange
Cross Streets
Between Sand Cyn Ave. & Laguna Fwy
Zip
92623
Total Acres
1.2

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.