Andrews Street Bypass Storm Drain Improvements
2 Documents in Project
Summary
SCH Number
2010081086
Lead Agency
City of San Luis Obispo
Document Title
Andrews Street Bypass Storm Drain Improvements
Document Type
NOD - Notice of Determination
Received
Posted
2/22/2011
Present Land Use
R-1, Single Family Residential and Open Space
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant, Mr. Matt Horn. The applicant proposes to replace an existing stormwater bypass facility. Abutments at the headwall inlet would be increased and the inlet structure would be lengthened to expand its debris-capturing capacity. An existing "rock catcher would be modified to include a low flow channel, the existing trash rack would be replaced with a larger trash rack, and the inlet would be enlarged and moved upstream to more efficiently collect debris. Quarter-ton rock slope protection (RSP) boulders would be used to build two (2) cross-vane weir erosion control structures in Andrews Creek upstream from the bypass facility, and vegetated RSP would be installed downstream from the rock catcher to reduce erosion. Debris and accumulated sediment would be removed to restore channel capacity and the bypass outlet to San Luis Obispo Creek. Equipment used will include a front-end loader, backhoe, and tracked excavator.
Contact Information
Name
Mike Hill
Agency Name
California Department of Fish and Game Central Region
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
Andrews Street & Cazadero Street
Zip
93401
Parcel #
001-270-001 thru 003, 001-244-010 thru 012
State Highways
Hwy 101
Railways
UPRR
Schools
San Luis Obispo High
Waterways
San Luis Obispo Creek
Base
MDB&M
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.