Draft Airport Layout Plan Project

2 Documents in Project

Summary

SCH Number
2010081001
Lead Agency
San Bernardino International Airport Authority
Document Title
Draft Airport Layout Plan Project
Document Type
NOD - Notice of Determination
Received
Posted
9/27/2010
Document Description
The Draft Airport Layout Plan assesses the existing San Bernardino International Airport (SBD or Airport) facilities and operations. Then, based on specific assumptions outlined in the Narrative Report, future Airport operations are forecast through the 2030 planning horizon. Finally, based on the future Airport operations forecast, the anticipated infrastructure modifications to the Airport that are required to support future operations are defined. At a general level this includes: air traffic patterns and the number of aircraft using the Airport; future vehicle traffic to access the Airport; facility requirements related to locations of structures and their associated physical and land use sensitive, and to size (construction impacts); the structure of airspace, air traffic control responsibilities and procedures taxiway operations, capacity analyses and precision approaches are defined; and support facility requirements are also defined. These descriptions and analyses in the Draft ALP only determined the minimum requirements for efficient operations for the future Airport development scenarios.

Contact Information

Name
Bill Ingraham
Agency Name
San Bernardino International Airport Authority
Contact Types
Lead/Public Agency

Location

Cities
San Bernardino
Counties
San Bernardino
Cross Streets
S Leland Norton Way
Zip
92408
Total Acres
~1,500
State Highways
I-10
Railways
BNSF Railway Company
Airports
San Bernardino International
Schools
several
Waterways
unnamed, man-made tributary of Santa Ana River
Township
1S
Range
3W
Section
8,9,16
Base
SBB&M

Notice of Determination

Approving Agency
San Bernardino Int'l Airport Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print