300 Cannery Row and 258/270 Foam Street Mixed Use Project

2 Documents in Project

Summary

SCH Number
2010061043
Lead Agency
City of Monterey
Document Title
300 Cannery Row and 258/270 Foam Street Mixed Use Project
Document Type
NOD - Notice of Determination
Received
Posted
2/23/2018
Present Land Use
300 Cannery Row:-Cannery Row (CR)/Commercial 258/270 Foam-Community Commercial (C-2)/Commercial
Document Description
The project encompasses two separate parcels located at 300 Cannery Row and 258/270 Foam Street. Project proposes to rehabilitate and subdivide 300 Cannery Row into 11 residential units and one 1404 sq. ft. retail space within the existing footprint of the structure and add a new 2,890 sq. ft. fourth story located at the north (bay) side of the existing structure. Common space would be a separate common ownership parcel. Twenty-two residential parking spaces (two spaces per residential unit) would be located off-site at 258/270 Foam Street. Some modifications are proposed to 300 Cannery Row including: alteration to the existing openings on the lower portion of the street-level facade; introduction of new openings on the northern board-formed concrete wall; removal of four of seven bow trusses; the addition of a fourth story at the rear of the building; removal of horizontal wood siding on the rear elevation and horizontal metal siding installed; new openings on the rear facade; and the construction of a new public access way along the north and east elevations. 258/270 Foam Street Phase I would include the construction of a two story parking structure with elevator and stair access from Foam Street lower level. Twenty-two parking spaces for the project at 300 Cannery Row would be provided at the lower level and 14 parking spaces would be provided at the main level. One ADA van accessible space would be dedicated to the 300 Cannery Row project to satisfy ADA requirements. Phase II of the project consists of the construction of a new 7,812 sq. ft., 3-story mixed-use building on top of the parking structure from Phase I. The project proposes five residential condominiums and one 1,020 sq. ft. retail space adjacent to Foam Street. Parking for the residential units and the retail space will be located on the main level of the parking structure. The construction of Phase II is contingent upon the acquisition of a water allocation from the City of Monterey water allocation program.

Contact Information

Name
Christy Hopper
Agency Name
City of Monterey
Contact Types
Lead/Public Agency

Location

Cities
Monterey
Counties
Monterey
Cross Streets
300 Cannery Row: Cannery Row & Dickman 258/270: Foam St & Dickman
Zip
93940
Total Acres
CR: .16/FM: .22
Parcel #
001-031-003, -032-010, 011
Schools
Bay View
Waterways
Monterey Bay

Notice of Determination

Approving Agency
City of Monterey
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print