Document Description
The project consists of replacement of the majority of the water distribution infrastructure throughout the community of McCloud with an entirely looped distribution system. The existing Bypass Pipelines, Schreder Phase 1 and Boyle Subdivisions pipelines would not be replaced since they have been installed within the past 10 yrs, and are not in need of replacement). The proposed project includes abandoning the existing distribution system in place and replacing it with ~12 miles (62,800 linear ft) of 6 inch to 12 inch PVC pipe. Much of the existing pipeline is within paved roadways or gravel alleys. The project is intended to serve the existing and planned needs of the MCSD for municipal and fire protection needs. The proposed project will require two crossing of Squaw Valley Creek, 5 crossings of Panther Creek, 4 crossings of the McCloud River Railway and 3 of SR 89. Three transmission mains would connect to the 12 inch looped main and cross SR 89 to serve the southern area of the MCSD. The projecdt includes the installation of new fire hydrants throughout the MCSD. The distribution system is planned to be constructed in 4 separate phases, Phase 1 through Phase 4. The actual construction timeline and ultimate phasing will be dependent upon available funds and completion of design level engineering.

Contact Information

Name
Van Robinson
Agency Name
McCloud Community Services District
Contact Types
Lead/Public Agency

Location

Cities
Mount Shasta
Counties
Siskiyou
Cross Streets
Streets & alleys within northwest,northeast,central dist service areas & north & south of SR 89
Zip
96057
Total Acres
62,800 lin ft
Parcel #
various
State Highways
SR 89
Railways
McCloud River RR
Airports
Mott
Schools
McCloud HS
Waterways
Squaw Valley Creek, Panther Creek
Township
40,39N
Range
2,3W
Section
31,36
Base
McCloud
Other Information
Sction: 1, 2, 6, 7

Notice of Determination

Approving Agency
McCloud Community Services District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.