McCloud Water Distribution Project

2 Documents in Project

Summary

SCH Number
2010052048
Lead Agency
McCloud Community Services District
Document Title
McCloud Water Distribution Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Various land uses throughout community of McCloud
Document Description
The project consists of replacement of the majority of the water distribution infrastructure throughout the community of McCloud with an entirely looped distribution system. The existing Bypass Pipelines, Schreder Phase 1 and Boyle Subdivisions pipelines would not be replaced since they have been installed within the past 10 yrs, and are not in need of replacement). The proposed project includes abandoning the existing distribution system in place and replacing it with ~12 miles (62,800 linear ft) of 6 inch to 12 inch PVC pipe. Much of the existing pipeline is within paved roadways or gravel alleys. The project is intended to serve the existing and planned needs of the MCSD for municipal and fire protection needs. The proposed project will require two crossing of Squaw Valley Creek, 5 crossings of Panther Creek, 4 crossings of the McCloud River Railway and 3 of SR 89. Three transmission mains would connect to the 12 inch looped main and cross SR 89 to serve the southern area of the MCSD. The projecdt includes the installation of new fire hydrants throughout the MCSD. The distribution system is planned to be constructed in 4 separate phases, Phase 1 through Phase 4. The actual construction timeline and ultimate phasing will be dependent upon available funds and completion of design level engineering.

Contact Information

Name
Van Robinson
Agency Name
McCloud Community Services District
Contact Types
Lead/Public Agency

Location

Cities
Mount Shasta
Counties
Siskiyou
Cross Streets
Streets & alleys within northwest,northeast,central dist service areas & north & south of SR 89
Zip
96057
Total Acres
62,800 lin ft
Parcel #
various
State Highways
SR 89
Railways
McCloud River RR
Airports
Mott
Schools
McCloud HS
Waterways
Squaw Valley Creek, Panther Creek
Township
40,39N
Range
2,3W
Section
31,36
Base
McCloud
Other Information
Sction: 1, 2, 6, 7

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, Northern and Eureka Region 1 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Valley Redding Region 5 (RWQCB), Caltrans, Division of Aeronautics, Department of Water Resources, Office of Historic Preservation, Resources Agency, California Department of Transportation, District 2 (DOT), California Department of Health and Human Services
State Reviewing Agency Comments
California Department of Transportation, District 2 (DOT), California Department of Health and Human Services
Development Types
Other (water distribution system, pipelines-62,800 linear ft)
Local Actions
encroachment
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Public Services, Transportation

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print