Removal Action Workplan (RAW), Fresno M-4 Elementary School Site (Site Code 104673)

3 Documents in Project

Summary

SCH Number
2010051030
Lead Agency
Fresno Unified School District
Document Title
Removal Action Workplan (RAW), Fresno M-4 Elementary School Site (Site Code 104673)
Document Type
NOD - Notice of Determination
Received

Document Description
The RAW specifies removal action objectives, evaluates alternatives, and describes the preferred alternative proposed for cleanup of lead, organ chlorine pesticides (OCP), and waste motor oil in shallow soil at the site. The objective of the RAW is to mitigate potential risk to human health and the environment by reducing or eliminating future exposure to chlordane and dieldrin (chlorinated pesticides used for termite control), lead (from lead-based paint) and waste motor oil in shallow soil identified at several locations within the site. Major elements of the removal action include (1) excavation of ~2,525 cubic yards of contaminated soil; (2) transportation of 140 to 150 truckloads of contaminated soil to permitted waste facilities; and (3) backfilling the excavations with clean soil derived from on-site sources. As required by Health and Safety Code Section 253456.1 (e)(1), a 30-day public comment period for the RAW was held from May 18, 2011 through June 17, 2009. No public comments were received. DTSC approved the RAW as final on June 20, 2011.

Contact Information
Juan Koponen
DTSC
Brownfields & Env. Restoration Program 8800 Cal Center Drive
Sacramento, CA 95826

916 255-3732

Location

Coordinates
36°43'33"N 119°45'21"W
Cities
La Jolla Fresno
Counties
San Diego Fresno
Cross Streets
West side of S. Cedar Ave between E. Heaton and E. Hamilton Aves
Zip
93702
Total Acres
8.43
Parcel #
multiple
State Highways
180
Railways
SJV
Schools
Sequoia MS, Winchell
Township
14S
Range
20E
Section
11
Base
MDB&M

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search