Red Clover Poco Restoration Project

2 Documents in Project

Summary

SCH Number
2010032046
Lead Agency
Plumas County
Document Title
Red Clover Poco Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
8/4/2010
Document Description
The Project will restore a floodplain to improve groundwater storage functions, stabilize a tributary channel and meadows, and restore the mainstem channel and reduce fine sediment delivery to Red Clover Creek. The Project includes: Conducting pre-construction activities, including finalizing the Project design, assessing the feasibility of the pond and plug design, conducting a field meeting, and collecting and compiling data; stabilizing ~1 mile of channel tributary to Red Clover Creek and 33 acres of meadow using rock headcut treatments; excavating and making 35 ponds (51.4 acres of pond) and building 34 gully plugs (12.5 acres of plug), redirecting flows from the gully into an existing remnant channel, constructing a fish passable rock grade control structure, and installing boulders in the floodplain at two sites; addind gravel to 1.5 mile of County Road 111; installing ~13,200 ft of liverstock fencing; conducting pre- and post-construction photo documentation; submitting "as-built" drawings, and monitoring and evaluating the Project.

Contact Information

Name
Michelle Lobo
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Portola
Counties
Plumas
Cross Streets
Plumas County Rd 111-aka Genesse-Beckwourth Rd
Zip
95971
Total Acres
178
Parcel #
USA ownership
Railways
No
Airports
No
Waterways
Red Clover Creek
Township
24,25N
Range
13E
Section
4,5,9,
Base
MDB&M
Other Information
Sections: 10, 27, 32, 33, 34

Notice of Determination

Approving Agency
SWRCB, Division of Financial Assistance
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print