Red Clover Poco Restoration Project

2 Documents in Project

Summary

SCH Number
2010032046
Lead Agency
Plumas County
Document Title
Red Clover Poco Restoration Project
Document Type
NOD - Notice of Determination
Received

Document Description
The Project will restore a floodplain to improve groundwater storage functions, stabilize a tributary channel and meadows, and restore the mainstem channel and reduce fine sediment delivery to Red Clover Creek. The Project includes: Conducting pre-construction activities, including finalizing the Project design, assessing the feasibility of the pond and plug design, conducting a field meeting, and collecting and compiling data; stabilizing ~1 mile of channel tributary to Red Clover Creek and 33 acres of meadow using rock headcut treatments; excavating and making 35 ponds (51.4 acres of pond) and building 34 gully plugs (12.5 acres of plug), redirecting flows from the gully into an existing remnant channel, constructing a fish passable rock grade control structure, and installing boulders in the floodplain at two sites; addind gravel to 1.5 mile of County Road 111; installing ~13,200 ft of liverstock fencing; conducting pre- and post-construction photo documentation; submitting "as-built" drawings, and monitoring and evaluating the Project.

Contact Information
Michelle Lobo
State Water Resources Control Board
Division of Financial Assistance 1001 I Street, 16th Floor
Sacramento, CA 95814

916-341-6983

Location

Cities
Portola
Counties
Plumas
Cross Streets
Plumas County Rd 111-aka Genesse-Beckwourth Rd
Zip
95971
Total Acres
178
Parcel #
USA ownership
Railways
No
Airports
No
Waterways
Red Clover Creek
Township
24,25N
Range
13E
Section
4,5,9,
Base
MDB&M
Other Information
Sections: 10, 27, 32, 33, 34

Notice of Determination

Approving Agency
SWRCB, Division of Financial Assistance
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
SWRCB, Division of Financial Assistance 1001 I Street, 16th Floor Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search