El Dorado High School Practice Gymnasium & District Performing Arts Center

3 Documents in Project

Summary

SCH Number
2010031086
Lead Agency
Placentia-Yorba Linda Unified School District
Document Title
El Dorado High School Practice Gymnasium & District Performing Arts Center
Document Type
NOD - Notice of Determination
Received
Posted
4/18/2011
Present Land Use
High School/R-1 (Single Family Residential District)/Low Density Residential
Document Description
Construct a 600-seat performing arts center (PAC) at EDHS. The project involves reconfiguration of the existing Lot A and Lot B, removal and relocation of existing portable classrooms, and relocation of two tennis courts. The PAC encompasses 18,000 SF and would serve all District students for various events such as drama, musical, band, choir, and speech performances. The parking lot reconfiguration would require relocation of the two northern most tennis courts to the east of the existing tennis courts, thereby connecting Lot A and Lot B, and thus providing a combined total of 499 spaces in Lot A and Lot B. No change to Lot C is required. The project would limit access to Driveway 3 (center driveway) to emergency trucks and buses only and divert traffic to Driveway 1 and Driveway 2 for Lot A and Lot B access.

Contact Information

Name
Mike Bailey
Agency Name
Placentia-Yorba Linda Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Placentia
Counties
Orange
Cross Streets
1651 Valencia Ave
Total Acres
1.8
State Highways
SR 90, SR 57
Schools
Brookhaven&Wagner ES
Township
3S
Range
9W
Section
19

Notice of Determination

Approving Agency
Placentia - Yorba Linda Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print