Zone 2 Line K Levee Remedial Work, Hayward, Alameda County, California
2 Documents in Project
Summary
SCH Number
2010022063
Lead Agency
Alameda County
Document Title
Zone 2 Line K Levee Remedial Work, Hayward, Alameda County, California
Document Type
NOD - Notice of Determination
Received
Posted
9/23/2010
Present Land Use
Open Space and Flood Control/Flood Plain, Industrial, and Air Terminal-Industrial Park/Open Space and Industrial
Document Description
The Alameda County Flood Control and Water Conservation District proposes to construct the necessary improvements along a portion of Zone 2, Line K (Sulfur Creek) to meet the Federal Emergency Management Agency (FEMA) levee certification requirements so that the south levee can be certified as providing 100 yr flood protection to the landslide of the levee. Otherwise, the landside properties will be mapped as a special flood hazard zone by FEMA requiring purchase of flood insurance. The Project construction area is ~ 2,100 linear feet long by 20 to 130 feet wide. It includes ~1,000 linear feet of channel work (excavation and trenching for a new 400 linear feet bypass channel and culvert installation underneath UPRR) and on the northerly bank, 1,700 linear feet of the southerly levee raising. The southerly levee crest elevation will be raised ~ 3 feet. The final crest width of 15 feet will be covered with gravel to provide year round maintenance access. Cofferdams will be used to dewater and direct flows out of the construction zone. Construction activities will take place along ~2,300 linear foot section of Sulphur Creek generally between the pump station and UPRR crossing in District Zone No. 2, City of Hayward.
Contact Information
Name
Justin Laurence
Agency Name
Alameda County Flood Control and Water Conservation District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Hayward
Counties
Alameda
Cross Streets
Cabot Blvd and West Winton Ave
Zip
94545
Total Acres
2
Parcel #
432011400805; 438002000302; 438006002500
State Highways
92
Railways
UPRR
Airports
Hayward Executive
Schools
Cabot College,Bohannon MS,Del Rey,Kipp King Collegiate,Arroyo HS
Waterways
SF Bay, San Lorenzo Creek, Sulphur Creek
Township
3S
Range
3W
Other Information
Base: San Leandro
Schools: Redwood Christian, Royal Sunset High, Lorenzo Manor, Colonial Acres ES, and Grant ES
Notice of Determination
Approving Agency
Alameda County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.