San Gabriel River Drop Structure Repair and Maintenance Project

2 Documents in Project

Summary

SCH Number
2010014002
Lead Agency
U.S. Army Corps of Engineers
Document Title
San Gabriel River Drop Structure Repair and Maintenance Project
Document Type
FIN - Final Document
Received

Document Description
The purpose and need of the Proposed Action is to conduct routine maintenance and repair of the San Gabriel River drop structures 3,4,5,7,8,9, and 10 by removing broken concrete and installing protective overlay concrete. Repair and maintenance of the drop structures would be accomplished in phases. The complete timeframe for repair of all seven drop structures is anticipated to be 7 months (30 days per structure). However, this may be shortened if some repair phases occur simultaneously. Repair of the drop structures would begin after the rainy season in approximately January 2010 and last until August 2010.

Contact Information
John Madden
U.S. Army Corps of Engineers
915 Wilshire Boulevard
Los Angeles, CA 90017

(213) 452-3887

Location

Cities
Azusa
Counties
Los Angeles
Cross Streets
Fish Cyn Rd./Brookridge Rd
Parcel #
San Gabriel River
State Highways
210
Railways
Metro and UPR
Schools
Azusa & Duarte Elem
Waterways
San Gabriel River

Notice of Completion

Development Type
Water Facilities (River Type)
Project Issues
Agricultural Land Air Quality Archaeologic-Historic Biological Resources Drainage/Absorption Flood Plain/Flooding Forest Land/Fire Hazard Geologic/Seismic Minerals Noise Population/Housing Balance Public Services Recreation/Parks Schools/Universities Soil Erosion/Compaction/Grading Solid Waste Toxic/Hazardous Traffic/Circulation Vegetation Water Quality Water Supply Wetland/Riparian Land Use Cumulative Effects Other Issues
Download CSV New Search