Lower San Joaquin River Reach TS30L Levee Improvement Project
7 Documents in Project
Summary
SCH Number
2010012027
Lead Agency
San Joaquin County Area Flood Control Agency
Document Title
Lower San Joaquin River Reach TS30L Levee Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/4/2023
Document Description
This Environmental Impact Report (EIR) is a supplement to the San Joaquin River Basin, Lower San Joaquin River (LSJR) Integrated Interim Feasibility Report/Environmental Impact Statement/Environmental Impact Report, State Clearinghouse No. 2010012027 (2018 LSJR FR/EIS/EIR). The Modified Project is one of six sub-reaches identified and evaluated within the 2018 LSJR FR/EIS/EIR Alternative 7a's Delta Front reach. The Modified Project is one of six sub-reaches identified within Alternative 7a’s Delta Front reach. It includes approximately 1 mile of cutoff wall construction, levee reshaping, and runoff erosion protection of the TS_30_L levee, as well as development of a borrow site, barge off-haul site, two co-located staging and stockpile areas, and haul routes.
Contact Information
Name
Kalia Schuster
Agency Name
Department of Water Resources: Flood Projects Branch
Job Title
Senior Environmental Scientist (Specialist)
Contact Types
Responsible Agency
Phone
Location
Cities
Stockton
Counties
San Joaquin
Regions
Citywide, Countywide
Cross Streets
Various
Notice of Determination
Approving Agency
Department of Water Resources
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
https://ceqanet.opr.ca.gov/2010012027/6
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.