Lower San Joaquin River Reach TS30L Levee Improvement Project
7 Documents in Project
Summary
SCH Number
2010012027
Lead Agency
San Joaquin County Area Flood Control Agency
Document Title
Lower San Joaquin River Reach TS30L Levee Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/3/2023
Document Description
The Final SEIR is a supplement to the San Joaquin River Basin, Lower San Joaquin River (LSJR) Integrated Interim Feasibility Report/Environmental Impact Statement/Environmental Impact Report, State Clearinghouse No. 2010012027 (2018 LSJR FR/EIS/EIR). The Modified Project is one of six sub-reaches identified and evaluated within the 2018 LSJR FR/EIS/EIR Alternative 7a's Delta Front reach. It Includes approximately 1 mile of cutoff wall construction, levee reshaping, and runoff erosion protection of the TS_30_L levee, as well as development of a borrow site, barge off-haul site, two co-located staging and stockpile areas, and haul routes. The Final SEIR also evaluates five potential biological mitigation to fulfill the Modified Project's compensatory mitigation requirements: three sites are evaluated at a project-level of detail and two sites are evaluated at a program-level of detail.
Contact Information
Name
Omar Al-Hindi
Agency Name
San Joaquin Area Flood Control Agency
Job Title
Executive Project Manager
Contact Types
Lead/Public Agency / Project Applicant
Phone
Location
Cities
Stockton
Counties
San Joaquin
Regions
Citywide, Countywide
Cross Streets
Various
Notice of Determination
Approving Agency
San Joaquin Area Flood Control Agency
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
22 E. Weber Avenue, Suite 301, Stockton, CA 95202
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.