Lower Blackwood Creek Restoration Project

4 Documents in Project

Summary

SCH Number
2010012013
Lead Agency
California Tahoe Conservancy
Document Title
Lower Blackwood Creek Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
1/13/2012
Document Description
The Conservancy, in conjunction with DGS, is proposing partial restoration of the lower reach of Blackwood Creek on the west shore of Lake Tahoe by implementing vegetation enhancement, bank stabilization, and trail rehabilitation elements that would contribute to improved creek conditions. The lower Blackwood Creek study area includes the lowest reach of the Blackwood Creek stream channel from its point of discharge into Lake Tahoe to 4,000 ft upstream. Relative to State Route 89, the study are begins 3,000 ft upstream (west) of SR 89 and extends ~1,000 ft downstream (east) of SR 89 to Lake Tahoe.

Contact Information

Name
Robert C. Hosea
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Placer
Cross Streets
South of Blackwood Canyon Rd and north of Tahoe Pines community-crosses SR 89
Zip
96141
Total Acres
75.3
Parcel #
085-360-03 et al
State Highways
SR 89
Schools
Coldstream Alternative
Waterways
Blackwood Creek and Lake Tahoe
Township
15N
Range
16E
Section
36
Other Location Info
City/Nearest Community: West shore of Lake Tahoe, north of Tahoe Pine Community and ~3 miles fouth of Tahoe City

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print