San Francisco Groundwater Supply Project

4 Documents in Project

Summary

SCH Number
2009122075
Lead Agency
San Francisco, City and County of (City and County of San Francisco)
Document Title
San Francisco Groundwater Supply Project
Document Type
NOD - Notice of Determination
Received

Document Description
The San Francisco Public Utilities Commission is proposing a project which provides an average of four million gallons per day of groundwater to San Francisco's municipal water supply Groundwater would be blended with San Francisco's existing municipal water supply system for distribution within San Francisco. The project consists of the construction and operation of six potable groundwater well facilities - two that would be converted from existing irrigation well facilities and four that would be newly constructed. Each facility would include a groundwater production well and a pump station. The SFPUC would also construct a distribution system (including pipelines and connection points) that would connect five of the well facilities to Sunset Reservoir; the sixth well would connect to the existing Lake Merced Pump Station, and would require a short length of distribution piping to make this connection. The groundwater would be pumped from the North Westside Groundwater Basin, which is located within the larger Westside Groundwater Basin and underlies parts of San Francisco and San Mateo Counties.

Contact Information
Tim Johnston
City and County of San Francisco
1650 Mission Street, Suite 400
San Francisco, CA 94103-2479

415 575 9035
415-558-6409
timothy.johnston@sfgov.org

Location

Coordinates
37°45'22"N 122°29'56"W
Cities
San Francisco
Counties
San Francisco
Cross Streets
Various
Zip
Various
Total Acres
~4
Parcel #
Various
State Highways
Routes: 1, 35, and 280
Railways
Taraval/Judah MUNI lines
Schools
Various
Waterways
Pacific Ocean, Lake Merced, Spreckels Lake, Stow Lake and Chain of lakes
Township
2S
Range
6W
Base
MDB&M

Notice of Determination

Approving Agency
San Francisco Public Utilties Commission
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
San Francisco Planning Department, 1650 Mission St., Suite 400, San Francisco CA 94103

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search