Ranchero Group Treated Water Line Extension Project

3 Documents in Project

Summary

SCH Number
2009122036
Lead Agency
Nevada Irrigation District
Document Title
Ranchero Group Treated Water Line Extension Project
Document Type
NOD - Notice of Determination
Received
Posted
9/1/2010
Document Description
NID prepared an EIR (Addendum) to assess the potential for environmental impacts related to a "changed condition" (i.e., changed circumstances, project changes, or new information potentially of substantial importance) associated with the NID Ranchero Group Treated Water Line Extension Projectthat may result in a different environmental impact than identified or evaluated in previous environmental documentation. NID prepared a CEQA environmental compliance document, the IS/MND for the Ranchero Group Treated Water Line Extension Project (NID 2009). NID's Board of Directors adopted the MND and approved the project on January 27, 2010. The proposed project change evaluated resulted from a change in project design during final preliminary engineering that occurred after adoption of the IS/MND. This information was not available at the time the IS/MND was completed. These changes specifically involve the construction of an additional 8 inch treated water pipeline segment between Salada Court and Salt Creek Road, and a new pressure release valve (PRV) station at the intersection of the pipeline and Salt Creek Road. The PRV station and an emergency pump intertie would be installed in an underground vault. During final preliminary engineering, it was determined that a PRV was necessary to ensure emergency water supply in the event of a pipe break in the southern area of the project. Additionally, the PRV would ensure adequate emergency fire flow availability to the northwest area of the project. This would be especially important if NID does not include the East Hacienda pipeline segment in the final project. This change in project approach will require construction on property between Salada Court and Salt Creek Road that was not previously included in the project.

Contact Information

Name
Tonia Tabucchi Herrera
Agency Name
Nevada Irrigation District
Contact Types
Lead/Public Agency

Location

Cities
Auburn
Counties
Nevada
Cross Streets
Magnolia Rd, Combie Rd
Zip
95602
Total Acres
~9
State Highways
49
Railways
No
Airports
No
Schools
Yes
Waterways
Magnolia Creek, Salt Creek, South Wolf Creek
Township
14N
Range
8E
Section
34
Base
MDB&M
Other Location Info
City/Nearest Community: Lake of Pines

Notice of Determination

Approving Agency
Nevada Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print