Construction and Operation of New Drinking Water Reservoir and Transmission Line
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2009121041
- Lead Agency
- Public Health, Department of (California Department of Public Health)
- Document Title
- Construction and Operation of New Drinking Water Reservoir and Transmission Line
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/6/2010
- Present Land Use
- Mountain Community, Residential with some Light Commercial Use
- Document Description
- Golden State Water Company will install a 0.5 MG water storage tank and ~1820 linear ft of 12 inch transmission line to serve the community of Wrightwood. The water tank will be built on a concrete pad and will measure 64 ft in diameter and be 24.5 ft in height. The waterline will be installed beginning at the intersection of Linnet Road and Elm Street and will continue through the Wrightwood Methodist Camp up to the new tank site. An 8 ft security fence will be installed around the site for security purposes.
- Contact Information
-
Lance Salisbury
California Department of Public Health
464 W. 4th Street, Room 437
San Bernardino, CA 92401
Phone : (909) 383-4328
Location
- Counties
- San Bernardino
- Cross Streets
- 1500 State Hwy 2 (SR 2 and SR 138)
- Zip
- 92397
- Other Location Info
- City/Nearest Community: Wrightwood
Notice of Determination
- Approving Agency
- California Department of Public Health
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 464 W, 4th Street, Rm 437 San Bernardino, CA 92401
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.