B Street Shore Power Project

2 Documents in Project

Summary

SCH Number
2009111064
Lead Agency
San Diego, Port of
Document Title
B Street Shore Power Project
Document Type
NOD - Notice of Determination
Received
Posted
1/11/2010
Document Description
The project will enable appropriately equipped cruise ships to plug in to the shore based power grid and turn off their engines. The project will result in substantial reductions in criteria pollutants and greenhouse gas emissions associated with cruise ship berthing at the B Street and Broadway piers. The project involves the construction of a series of utility boxes in close proximity to one another with a combined length of 70 ft, a combined width of 35 ft and up to 12 ft in height. The San Diego Unified Port District approved the Coastal Development Permit for installation of the utility boxes, safety fencing, cable and equipment installation on B Street Pier as well as the installation of cable along North Harbor Drive and equipment on Broadway Pier.

Contact Information

Name
Matt Valerio
Agency Name
San Diego, Port of
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
North Harbor Dr
Zip
92101
Railways
Trolley, Coaster, Amtrak
Airports
San Diego Int'l
Waterways
San Diego Bay

Notice of Determination

Approving Agency
San Diego Unified Port District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print