Sheldon and Waterman (EG-06-1146)

2 Documents in Project

Summary

SCH Number
2009102073
Lead Agency
City of Elk Grove
Document Title
Sheldon and Waterman (EG-06-1146)
Document Type
NOD - Notice of Determination
Received
Posted
2/1/2010
Document Description
The Applicant is proposing: - A rezone from AG-80 (General Agriculture) to AR-2 (Agricultural-Residential Zone 2 Acres Min.); and - A tentative subdivision map to divide the existing single 118 +/- acre parcel and create 26 new lots (ranging from 2-4 acres in size) and one remainder open space lot (~50 acres in size). The proposed project does not include development of the 26 new residential parcels beyond grading and construction of improvements (e.g., roads, utilities, storm water drainage). It is anticipated that the lots will be sold and developed as custom homes by future individual property owners. The desgin of the subdivision is divided into two sub-areas - the east and west sides acre remainder lot. The east side consists of six 2 acre lots and the 50 +/- acre remainder lot. The entire eastern side of the project site is proposed for development. A total of 20 lots would be created in this portion of the project site. All would take access off of a loop road with two access points off of Sheldon Road. The project includes the establishment of two multiuse trail corridors. The first would be located directly underneath the power line corridor on the western-most side of the property. The second would be located directly east of Laguna Creek. As part of this project, the western power line trail will be developed.

Contact Information

Name
Christopher Jordan
Agency Name
City of Elk Grove
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
Sheldon Rd and Waterman Rd
Zip
95624
Total Acres
118 +/-
Parcel #
127-0010-077
State Highways
99
Railways
UPRR
Schools
various
Waterways
Laguna Creek

Notice of Determination

Approving Agency
City of Elk Grove
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print