El Rancho Road Bridge Replacement Project

2 Documents in Project

Summary

SCH Number
2009102034
Lead Agency
San Joaquin County
Document Title
El Rancho Road Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/2/2010
Document Description
The project is limited to removing a 58 ft long, 21 ft wide, three-span timber bridge and replacing it with a 110 ft, 6 inch long, 31 ft, 10 inch wide, three-span concrete flat slab bridge. The proposed flat slab bridge will be supported with no more than 10 concrete piles not to exceed 24 inch diameter per pile. Construction activities will include removal of the current bridge by small equipment assisted by a tractor, existing pile removal using a crane, vibratory hammer, direct pull, and clamshell equipment, pile driving of 24-inch diameter (maximum) concrete piles to be hammer-driven directly into the slough from a pile-driving crane behind the existing abutments, removal of existing timber abutments, construction of new concrete abutments, construction of the bridge deck using new or false work piles and a crane, and restoration of the disturbed bank.

Contact Information

Name
Andrea Boertien
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Tracy
Counties
San Joaquin
Cross Streets
I-205 / West Canal Blvd
Zip
95304
Total Acres
~2.35 +/-
State Highways
205
Railways
UPRR
Schools
Banta ES
Waterways
Tom Paine Slough / Old River
Township
2S
Range
5E
Section
0

Notice of Determination

Approving Agency
California Dept. of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print