State Route 180 King River Overflow Bridge Project - Agreement 2012 0007-R4

8 Documents in Project

Summary

SCH Number
2009091121
Lead Agency
California Department of Transportation, District 6
Document Title
State Route 180 King River Overflow Bridge Project - Agreement 2012 0007-R4
Document Type
NOD - Notice of Determination
Received
Posted
4/30/2012
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement, pursuant to Section 1602 of the Fish and Game Code, to the Project applicant. Caltrans proposes to replace existing Bridge (Br No 42-0074) with a new structure which will include upgraded 8 foot wide shoulders and approaches. The total width of the bridge will increase to 44 feet and includes one 12 foot lane in each direction. The existing 8 small piers and 2 abutments will be replaced by 4 larger piers and 2 abutments that are aligned parallel to the stream-flow. The demolition and construct will be completed in two stages in order to maintain one for traffic during construction. Temporary access will be provided by the removal of 13 trees. No fill or excavation is proposes for the temporary access. A water diversion will be required. For bridge removal, no portions of the old structure will be left in the channel, and where abutments are removed, no depression will be left, but will be filled with clean gravel of an appropriate size (0.5-4 inches). The Project will also relocate utilities.

Contact Information

Name
Laura Peterson-Diaz
Agency Name
California Transportation Commission
Contact Types
Lead/Public Agency

Location

Counties
Fresno
Cross Streets
between SR 180/E Lone Oak Rd and SR 180/Reed Ave
Other Location Info
City/Nearest Community: Minkler

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No