Garner Basin Project

2 Documents in Project

Summary

SCH Number
2009081103
Lead Agency
Kings County
Document Title
Garner Basin Project
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2009
Document Description
The Project is a modification and an improvement to an existing basin that has been in use for many year. The Project includes the construction of a single-cell 36.6 acre basin. The existing basin would be significantly expanded and the location of the basin shifted slightly to allow and adjacent landowner to reclaim some agricultural land. The portion of the existing basin that is to be reclaimed would be filled to match grade with adjacent fields with material fromt he newly excavated basin. The basin would be excavated to a maximum depth of 8 ft. Excavated materials would be used to create the new basin's levees, onsite grading, and to reclaim some of the existing basin area. The remaining excavated material is planned to be sold to other agencies or the public, if necessary. There is a reasonable expectation that the excess material from excavation of the site will be utilized for road fill for the State of California widening of SR 198. Approximately 8 willow trees (2 large trees and 6 smaller trees) would be removed during project construction.

Contact Information

Name
Don Mills
Agency Name
Kings County Irrigation District
Contact Types
Lead/Public Agency

Location

Cities
Hanford
Counties
Kings
Cross Streets
SR 198 and 7th Ave
Zip
93230
Total Acres
37 +/-
Parcel #
016-070-101
State Highways
SR 198
Schools
Kit Carson ES
Waterways
Settlers Ditch
Township
19S
Range
25E
Section
29
Base
MDB&M

Notice of Determination

Approving Agency
Kings County Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print