Groundwater Storage and Recovery Project

2 Documents in Project

Summary

SCH Number
2009062096
Lead Agency
San Francisco, City and County of (City and County of San Francisco)
Document Title
Groundwater Storage and Recovery Project
Document Type
EIR - Draft EIR
Received

Document Description
Note: Extended Review The San Francisco Public Utilities Commission (SFPUC) is proposing a project to increase water supply reliability during dry years and in emergencies, by increasing water storage in the South Westside Groundwater Basin during wet and normal years for subsequent recapture during dry years. The proposed project consists of the construction and operation of 16 new groundwater production wells and water treatment facilities to recover the stored groundwater. Each well facility would include the construction of a groundwater production well and associated fenced enclosure or treatment building, distribution pipelines to connect the well to the existing regional water system or to the local distribution system, and overhead or underground utility connections. Most well facilities would provide disinfection and additional treatment (i.e., pH adjustment, fluoridation, and/or iron/manganese removal). In addition, the proposed project includes upgrades to the Westlake Pump Station to serve three new well facilities (Sites 2, 3, and 4), including new fluoride, chlorine, and ammonia chemical storage tanks, replaced or upgraded chemical metering pumps, a resized transformer, and up to three new booster pumps to deliver the additional water into the Daly City distribution system, all of which would be located within the existing pump station building.

Contact Information
Tim Johnston
City and County of San Francisco
Planning Department 1650 Mission Street, Suite 400
San Francisco, CA 94103-2479

415 575 9035

Location

Cities
South San Francisco San Bruno Daly City Burlingame
Counties
San Mateo
Cross Streets
Various (16 sites)
Total Acres
0.3 - 1.2 each
Parcel #
Various
State Highways
Hwy 280, 92, 82, 380
Railways
BART, Caltrain
Airports
SFO, San Carlos
Schools
Various
Waterways
Various

Notice of Completion

Review Period Start
Review Period End
Development Type
Water Facilities (Production Wells Type, Up to 7.2 MGD) Other (Pump station, distribution pipelines)
Local Action
Other Action Other Action: Groundwater Production
Project Issues
Cumulative Effects Landuse Growth Inducing Wetland/Riparian Water Supply Water Quality Vegetation Traffic/Circulation Toxic/Hazardous Solid Waste Soil Erosion/Compaction/Grading Sewer Capacity Septic System Schools/Universities Recreation/Parks Public Services Population/Housing Balance Noise Minerals Geologic/Seismic Forest Land/Fire Hazard Flood Plain/Flooding Drainage/Absorption Coastal Zone Biological Resources Archaeologic-Historic Air Quality Agricultural Land Aesthetic/Visual
Reviewing Agencies
California Coastal Commission California Department of Parks and Recreation California Department of Public Health California Highway Patrol California Public Utilities Commission Caltrans, District 4 Caltrans, Division of Aeronautics Department of Fish and Wildlife, Region 3 Department of Toxic Substances Control Department of Water Resources Native American Heritage Commission Regional Water Quality Control Board, Region 2 Resources Agency State Water Resources Control Board, Division of Water Rights