Al Tahoe Erosion Control Project 1; Clean Water State Revolving Fund (CWSRF) No. C-06-6109-110

4 Documents in Project

Summary

SCH Number
2009052011
Lead Agency
City of South Lake Tahoe
Document Title
Al Tahoe Erosion Control Project 1; Clean Water State Revolving Fund (CWSRF) No. C-06-6109-110
Document Type
NOD - Notice of Determination
Received
Posted
9/22/2009
Document Description
The Project provides improvements to the storm water collection system, including removing 20 existing drain inlets along Pasadena, Lakeview, Alameda, Tallac, and San Francisco Avenues, replacing them with drop inlets with sediment collection sumps and the capacity to infiltrate storm water and snow melt, and replacing the existing storm drain system to further encourage infiltration. The Project also includes plans to install an advanced treatment media filter with a pretreatment vault at the terminus of Pasadena Avenue, which will connect to the existing storm drain outlet. Additionally, the planned Project includes the installation of an infiltration system at the corner of Modesto and Riverside Avenues; and installation of permeable pavements on the shoulders along Pasadena Avenue from Modesto to Lakeview Avenues. Additionally, installation of parking deterrent should encourage drivers to park on the pavement, allowing the re-vegetated shoulder to provide natural infiltration and erosion control. With the help of the Tahoe Resource Conservation District, homeowners and local businesses will also be encouraged to implement Best Management Practices (BMPs) to reduce storm water run-off from private property.

Contact Information

Name
Mina Danieli
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
South Lake Tahoe
Counties
El Dorado
Cross Streets
Us Hwy 50, Lakeview Avenue
Zip
96150
Total Acres
55
State Highways
Hwy 50
Railways
No
Airports
No
Schools
South Tahoe MS
Waterways
Lake Tahoe
Township
13,12N
Range
18E
Section
32,3
Base
MDB&M

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print