Sierra Tract Erosion Control Project, Phase 1b

4 Documents in Project

Summary

SCH Number
2009042061
Lead Agency
City of South Lake Tahoe
Document Title
Sierra Tract Erosion Control Project, Phase 1b
Document Type
NEG - Negative Declaration
Received
Present Land Use
Residential
Document Description
Drainage improvement retrofit is proposed in an existing densly urbanized residential subdivision with earthen shoulders devoid of any collection, conveyance or treatment systems. Proposed improvements include installing curb and gutter, storm drain pipe, drainage inlets, rock step pools, rock bowls and concrete headwalls; constructing treatment facilities on vacant public parcels, or within the public right-of-way; and restoring roadside shoulder soil and vegetation to infiltrate storm water runoff. Demolition of a single family residence (owned by the City) with subsequent stream environment zone restoration on the parcels is also proposed.

Contact Information

Name
Jennifer Quickel
Agency Name
City of South Lake Tahoe
Contact Types
Lead/Public Agency

Location

Cities
South Lake Tahoe
Counties
El Dorado
Cross Streets
Area bonded by Sierra Blvd, Barbara Ave, O'Malley Dr, US Hwy 50
Zip
96150
Total Acres
87
State Highways
50
Railways
No
Airports
Lake Tahoe
Schools
Tahoe Valley, Middle
Waterways
Trout Creek
Township
12N
Range
18E
Section
3
Base
MDB&M

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Cal Fire, California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 3 (DOT), California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Lahontan South Lake Tahoe Region 6 (RWQCB), Department of Toxic Substances Control, Department of Water Resources, Office of Historic Preservation, Other Agency(ies), Resources Agency, Resources, Recycling and Recovery, Tahoe Regional Planning Agency (TRPA)
Development Types
Transportation:Other (erosion control project)
Local Actions
major design
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Schools/Universities, Transportation, Vegetation, Wetland/Riparian, Wildfire, utilities/services

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print