Calaveras River McGurk's C14-C Pump Project. SAA 1600-2009-0099-R2
2 Documents in Project
Summary
SCH Number
2009032094
Lead Agency
Stockton East Water District
Document Title
Calaveras River McGurk's C14-C Pump Project. SAA 1600-2009-0099-R2
Document Type
NOD - Notice of Determination
Received
Posted
11/4/2009
Present Land Use
PLU: Agricultural
Z: AG-40
GPD: A/G
Document Description
The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2009-099-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Kevin Kauffman, Stockton East Water District.
The project involves the installation of a river pump station in the Calaveras River. The Construction involves the excavation of approximately 24.66 cubic yards of soil and replacing it with 18.8 cubic yards of rip-rap, for bed and bank protection. Approximately 0.48 cubic yards of concrete will be used to form a 4' x 4' concrete slab foundation within the bank of the Calaveras River.
A 12" irrigation outlet with a quick release will be placed on the north river bank to connect to the property owners existing irrigation line.
Water will be pumped (diverted) from April to October 15th each year. Pump will be physically removed by November 1st each year.
Contact Information
Name
Amy Kennedy
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Joaquin
Cross Streets
Hwy 26
Zip
95236
Total Acres
0.023
Parcel #
067-190-14
State Highways
26
Railways
No
Airports
No
Schools
No
Waterways
Calaveras River, Mormon Slough, Duck Creek
Township
3N
Range
9E
Section
33
Other Location Info
City/Nearest Community: Bellota
Notice of Determination
Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.