Improvement of Line A, From the 20 Tide Gate Structure to the Union Pacific Railroad, and Upstream of Freeway at I-880 Hayward, Alameda County
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2009012026
- Lead Agency
- Alameda County
- Document Title
- Improvement of Line A, From the 20 Tide Gate Structure to the Union Pacific Railroad, and Upstream of Freeway at I-880 Hayward, Alameda County
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/8/2010
- Document Description
- The project is limited to desilting of the channel. Sediment removal will be focused on the center island of sediment, preserving the majority of two adjacent habitat areas: 1) the low-flow channel along the southeastern side of the site, and 2) marsh and upland habitats adjacent to the sediment island. The flood-flow capacity and design configuration of Old Alameda Creek will be restored by excavating and removing a total of ~39,000 cy of accumulated sediment. The project is located on the border of Hayward and Union City in Alameda County, between the 20 Tide Gate Structure to the Union Pacific Railroad (UPRR) crossing.
- Contact Information
-
Marcia Grefsrud
California Department of Fish and Game
Bay Delta Region P.O. Box 47
Yountville, CA 94599
Phone : (707) 644-2812
Location
- Coordinates
- 37°36'15"N 122°05'24"W
- Counties
- Alameda
- Cross Streets
- Hesperian Blvd.
- Zip
- 94545
- State Highways
- 92 and I-880
- Railways
- Union Pacific Railroad
- Waterways
- San Francisco Bay
- Other Location Info
- Hayward
Notice of Determination
- Approving Agency
- DFG
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Alameda County 399 Elmhurst Hayward, CA 94544
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- N/A
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.