Operation of Coachella Valley Water District- Cove Community- Sky Mountain Reservoir 4605-1 Project (Project)

5 Documents in Project

Summary

SCH Number
2009011024
Lead Agency
Coachella Valley Water District (CVWD)
Document Title
Operation of Coachella Valley Water District- Cove Community- Sky Mountain Reservoir 4605-1 Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
11/14/2019
Document Description
The District constructed two 1 0-million-gallon reservoirs, concrete canal swales, two retention basins, and a driveway. Storm drainage piping, a transformer, an electrical system, including lighting, and a supervisory control and data acquisition system was also installed. The property was enclosed with a fence, gate, and lock. An associated water conveyance pipeline was also laid to connect the tank to the rest of the system. The conveyance pipeline consisted of approximately 14,400-linear feet of 36-inch diameter pipe beginning at the reservoir site and ending at an existing pipeline south of Interstate 10, and north of the Ramon Road/Bob Hope Drive intersection. The Project will provide for the operation of the system.

Contact Information

Name
Steve Williams
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Name
Agency Name
Coachella Valley Water District
Contact Types
Project Applicant

Location

Counties
Riverside
Regions
Unincorporated
Other Location Info
Reservoir Site: near 28th Avenue and Rio Del Sol in an unincorporated area (near Thousand Palms) in Riverside County Conveyance Pipeline: Along Robert Drive, Avenue 30; Varner Road, across Union Pacific Railroad, along Union Pacific Railroad, and down to Raymond Road in an unincorporated area and in Thousand Palms in Riverside County

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print