Serras Seawall Project
3 Documents in Project
Summary
SCH Number
2009011017
Lead Agency
Big Bear Municipal Water District
Document Title
Serras Seawall Project
Document Type
NOD - Notice of Determination
Received
Posted
4/23/2009
Document Description
CDFG is executing a Lake or Streambed Alteration Agreement (SAA # 1600-2008-0141-R6) pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Ms. Carole Serras, 13301 Summit Circle, City of Poway, State of Califonia, 92064, Phone (858) 679-1200. The Applicant is proposing to construct a vertical seawall on the property located at 39583 Lake Drive (APN 307-023-03). The seawall wiil be ~10 ft wide by 25 ft long and will be constructed from reinforced concrete, blocks, and 20 cubic yards of earthern fill. The total project footprint is 436 sf, of 0.01 acres. The vertical extent of the seawall will reach an elevation of 6,745 ft above sea level (ASL). The established high water level for Big Bear Lake Reservoir is 6,743 ASL.
Contact Information
Name
Ms. Anna Milloy
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Big Bear Lake
Counties
San Bernardino
Cross Streets
Lake Drive and Altone Road
Zip
92064
Total Acres
0.01
Parcel #
307-023-03
State Highways
18
Schools
4
Waterways
Big Bear Lake
Township
2N
Range
1W
Section
24
Notice of Determination
Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.