Serras Seawall
3 Documents in Project
Summary
SCH Number
2009011017
Lead Agency
Big Bear Municipal Water District
Document Title
Serras Seawall
Document Type
NOD - Notice of Determination
Received
Posted
4/7/2009
Document Description
The proposed project is the construction of an approximately 6 foot high seawall on the southwestern portion of an existing residence (Lot 2, Block K, Tract 2641). The Assessor's Parcel Number is 307-023-03 and the residence is located at 39583 Lake Drive in the City of Big Bear Lake, California. The seawall will be constructed from reinforced concrete, blocks and clean earth fill. It will be approximately six feet high and 25 feet long and will use approximately 20 cubic yards of backfill. The total project footprint will be approximately 436 square feet (0.01 acres). The top of the seawall will be at an elevation of approximately 6745 feet above sea level (ASL). The established high water level for Big Bear Lake is approximately 6743 feet ASL.
Contact Information
Name
Mike Stephenson
Agency Name
Big Bear Municipal Water District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Big Bear Lake
Counties
San Bernardino
Cross Streets
Lake Drive and Altone Road
Zip
92064
Total Acres
0.01
Parcel #
307-023-03
State Highways
18
Schools
4
Waterways
Big Bear Lake
Township
2N
Range
1W
Section
24
Notice of Determination
Approving Agency
Big Bear Municipal Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.