Owens Lake Revised Moat and Row Dust Control Project (SAA 1600-2009-0039-R6)
8 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008121074
- Lead Agency
- Los Angeles, City of (City of Los Angeles)
- Document Title
- Owens Lake Revised Moat and Row Dust Control Project (SAA 1600-2009-0039-R6)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/16/2010
- Document Description
- The applicant proposes to implement ~3.5 square miles of dust control on the Owens Lake bed in order to eliminate exceedances of the federal particulate matter (PM10) standard as mandated by the Clean Air Act Amendments of 1990, through construction of a landform feature called Moat and Row. Moat and Row is a method of dust control that typically does not utilize applied water to reduce dust emissions from the Owens Lake bed.
- Contact Information
-
Brad Henderson
Caifornia Department of Fish and Game
407 W. Line Street
Bishop, CA 93514
Phone : (760) 873-4412
Location
- Coordinates
- 36°26'36"N 117°56'52"W
- Counties
- Inyo
- Cross Streets
- State Route 395, HIghway 136, Highway 190
- Zip
- 93545
- Total Acres
- 2,240
- State Highways
- 395, 136, 190
- Railways
- UPRR
- Airports
- none
- Schools
- none
- Waterways
- Los Angeles Aqueduct, Owens River
- Other Location Info
- City/Nearest Community: Lone Pine
Notice of Determination
- Approving Agency
- CDFG
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- CDFG 407 W. Line St Bishop, CA 93514
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.