Owens Lake Revised Moat and Row Dust Control Measures

8 Documents in Project

Summary

SCH Number
2008121074
Lead Agency
City of Los Angeles
Document Title
Owens Lake Revised Moat and Row Dust Control Measures
Document Type
NOD - Notice of Determination
Received
Posted
9/22/2009
Document Description
Los Angeles Department of Water and Power (LADWP) proposes to reduce dust emissions in the historic Owens Lake bed in order to eliminate exceedances of the federal particulate matter (PM10) standard, through construction of a landform feature called moat and row. The moat and row dust control measure, as initially configured, is a method of dust control that does not require the addition of supplemental water to reduce dust emissions from the lake bed. A moat and row element is up to an 89-foot wide disturbed linear corridor that consists of an earthen berm (row) approximately 5 feet high with 1.5:1 (horizontal to vertical) sloping sides and a base of up to 19 feet wide, flanked on the otherside by ditches (moats) approximately 4 to 5.5 feet deep and up to 20 feet wide at the widest point. Rows serve as windbreaks and the primary function of the moats is to capture sand.

Contact Information

Name
Tom Dailor
Agency Name
Los Angeles, City of
Contact Types
Lead/Public Agency

Location

Counties
Inyo
Cross Streets
State Route 395, HIghway 136, Highway 190
Zip
93545
Total Acres
2,240
State Highways
395, 136, 190
Railways
UPRR
Airports
none
Schools
none
Waterways
Los Angeles Aqueduct, Owens River
Other Location Info
City/Nearest Community: Lone Pine

Notice of Determination

Approving Agency
City of Los Angeles Dept of Water and Power
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.