Lovelady Ranch Gravel Extraction

3 Documents in Project

Summary

SCH Number
2008092012
Lead Agency
Colusa County
Document Title
Lovelady Ranch Gravel Extraction
Document Type
NOD - Notice of Determination
Received
Posted
4/7/2009
Document Description
The CDFG is executing Lake or Streambed Alteration Agreement No. 1600-2007-0175-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, David McCosker, representing Lovelady Ranch LLC and Little Stony LLC. This project will extract of sand and gravel from the stream bed of Little Stony Creek on property owned or operated by Lovelady Ranch LLc and Little Stony LLc. Where native riparian shrubs or trees such as cottonwoods and willows are removed, they will be counted and revegetated on site in the fall. All wet and dry stream channels will be retained. Wet depressions and ponded areas will remain undisturbed. Up to 5 temporary crossings with culverts will be installed to allow construction equipment to cross active channels in Little Stony Creek. The culverts will be placed at, or below streambed grade and all fill will be made using washed gravels from the site. The temporary crossings will be removed from the creek bed every year at the Cessation of extraction and restoration activities. The volume of gravel removed annually will be no more than 25,000 cubic yards and will be established annually by the DFG in writing through annual review of replenishment of gravel to the site. Work in the Goat Mountain Road area shall be limitied to truck traffic on existing haul and access roads to avoid impacts to sensitive species.

Contact Information

Name
Kelley Barker
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Colusa
Cross Streets
Goat Mountain Road / Lodoga-Stonyford Road
Parcel #
010-290-009,15,18,19,20,21
Railways
No
Schools
No
Waterways
Little Stony Creek
Township
T17N
Range
R6W
Section
27,28
Base
MDB&M
Other Location Info
Stonyford

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print