State Route 91 Corridor Improvement Project

13 Documents in Project

Summary

SCH Number
2008071075
Lead Agency
California Department of Transportation, District 8 (DOT)
Document Title
State Route 91 Corridor Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/10/2020
Document Description
The State Route 91 Corridor Improvement Project (Project) includes capacity, operational, and safety improvements on SR-91 and Interstate 15 (I-15). The Project was analyzed in an environmental impact. The Project remains consistent with the EIR/EIS, except for the following design changes: 1. Adding approximately 9 to 10 feet of pavement to SR-91 on the outside at some locations and restriping in others; 2. Widening the County Line Creek Undercrossing; 3. Constructing new retaining walls approximately 3,200 feet in length and approximately 6 to 28 feet in height on the north side of SR-91; 4. Reconstructing a portion of Green River Road; 5. Replacing overhead signs; and 6. Adding high mast lighting on the north side of the outside barrier. Caltrans prepared an Addendum to the EIR/EIS analyzing the above changes and adopted the Addendum and approved the changes in March 2020.

Contact Information

Name
Shawn Oriaz
Agency Name
Caltrans District 8
Contact Types
Lead/Public Agency

Name
Agency Name
Riverside County Transportation Commission
Contact Types
Project Applicant

Location

Counties
Riverside
State Highways
I-15, SR 91

Notice of Determination

Approving Agency
Riverside County Transportation Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print