Palomar Community College San Marcos Campus Facilities Master Plan

2 Documents in Project

Summary

SCH Number
2008071024
Lead Agency
Palomar Community College District
Document Title
Palomar Community College San Marcos Campus Facilities Master Plan
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
GPD: North: Open Space; Residential (4-6 du/ac); Residential (.125-1 du/ac) East: Open Space; Residential (.125-1 du/ac); Office Professional; Junior High School South: Business; Industrial West: Residential (2-4 du/ac); Commercial LU: North: Open Space, Residential East: Open Space, residential, medical office, San Marcos Junior High School South: NCTD Sprinter Station, light industrial, commercial buildings Mission Sports Park West: Gas station/mini-mart, church residential
Document Description
The Master Plan encompasses growth and development of the existing San Marcos campus from the present through 2022. The overall purpose of the Master Plan is to increase the on-campus capacity to accommodate the anticipated growth in student enrollment up to a maximum of 25,000 students through the year 2022. This will be accomplished via the following means: infrastructure improvements; demolition of older, single-story buildings; construction of new multi-story buildings; replacement of inadequate temporary space with permanent facilities; modernization of the majority of existing buildings to remain; consolidation of facilities; modernization of the majority of existing buildings to remain; consolidation of instructional space to minimize land development and create more open space; and facilities planning that is sensitive to environmentally sensitive areas and topography.

Contact Information

Name
Kelley Hudson-MacIsaac
Agency Name
Palomar Community College District
Contact Types
Lead/Public Agency

Location

Cities
San Marcos
Counties
San Diego
Cross Streets
W. Mission Road, W. Borden Road, N. Las Posas Road, S. Santa Fe Avenue
State Highways
78

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Parks and Recreation, California Highway Patrol, California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), Department of Water Resources, Office of Historic Preservation, Resources Agency, Department of Toxic Substances Control, California Native American Heritage Commission (NAHC), California Department of Conservation (DOC)
State Reviewing Agency Comments
Department of Toxic Substances Control, California Native American Heritage Commission (NAHC), California Department of Conservation (DOC)
Development Types
Educational
Local Actions
Master Plan
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Transportation, Other

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print