Elk Grove Intermodal Rail Station

3 Documents in Project

Summary

SCH Number
2008062084
Lead Agency
City of Elk Grove
Document Title
Elk Grove Intermodal Rail Station
Document Type
NOD - Notice of Determination
Received
Posted
4/30/2010
Document Description
The City of Elk Grove proposes to construct an intermodal rail station south of the Sheldon Road/Elk Grove Florin Boulevard intersection on the west side of Elk Grove Florin Road at the UPRR tracks. Because exact locations and design details of many of the project's features have not been determine at this point in the planning process, the project is being analyzed as a Master Plan. Subsequent projects in future stages of the planning process that include more detailed design will be included under the scope of this Master Plan and its associated environmental analysis. The proposed project would include the following primary features: - New signalized intersection at Elk Grove-Florin Road just south of Sheldon Road - Installation of frontage improvements (curb and sidewalk), and addition of third through-traffic lane and bicycle land along southbound Elk Grove-Florin Road beginning at the northern limits of the project area and ending at Camden Road. From a point approximately 100 feet south of where Elk Grove-Florin Road crosses the UPRR tracks, the new southbound sidewalk, bike lane, and traffic lane will connect with an existing widened portion of Elk Grove-Florin Road south to Camden Road. -800 feet long Passenger platform -Passenger loading zones -Approximately 110 Designated parking areas; -Pedestrian/bicycle trail; -Bicycle lockers; -Bridge over Whitehouse Creek; -Landscaping; -Water detention basin; and -An area for a future 1,500sf building at the platform.

Contact Information

Name
Jed McLaughlin
Agency Name
City of Elk Grove
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
Sheldon Road/Elk Grove-Florin Road
Zip
95624
Total Acres
12.8
Parcel #
116-0042-024, 025, 007
State Highways
99
Railways
Union Pacific
Airports
No
Schools
Raymond Case & Roy Herburger Elementary Schools
Waterways
Whitehouse Creek
Township
6N
Range
5E
Section
3
Base
MDB&B

Notice of Determination

Approving Agency
Elk Grove City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.