Persson Minor Subdivision
2 Documents in Project
Summary
SCH Number
2008062019
Lead Agency
Humboldt County
Document Title
Persson Minor Subdivision
Document Type
NOD - Notice of Determination
Received
Posted
8/13/2008
Present Land Use
A 10.18-acre parcel with one existing residence, several outbuildings and on-site sewage disposal system (SDS). Existing residence is served by community water from Humboldt Community Services District (HCSD).
Zoning: Residential Single Family with a 1 acre minimum parcel size (R-1-B-4).
General Plan: Residential Low Density (RL), Eureka Community Plan (ECP); 1-6 units per acre.
Document Description
The project consists of a parcel map subdivision of an existing +/- 10.2-acre parcel creating three parcels ranging in size from 1.08 acres to 1.27 acres, and a remainder parcel of 6.7 acres. The remainder parcel is already developed with a residence and residential outbuildings and an on-site sewage disposal system. The area is served by community water, but the one-acre minimum reflects the parcel sizes needed to support on-site sewage disposal systems. All parcels will be accessed via public roads. The project also involves an exception to the lot frontage requirement to permit a flag lot design for proposed remainder parcel pursuant to Section 7-2 of the Subdivision Regulations. The site drains to the southwest toward Orton Creek and Elk River. There are no known wet areas or other watercourses in the vicinity of this site.
Contact Information
Name
Elizabeth Burks
Agency Name
Humboldt County Community Development Services
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Eureka
Counties
Humboldt
Cross Streets
Westgate Drive and Bassford Road
Zip
95503
Total Acres
10.18
Parcel #
304-162-04
State Highways
101
Schools
Ridgewood School
Waterways
Elk River, Orton Creek, Humboldt Bay
Township
4N
Range
1W
Section
10
Base
HB&M
Notice of Determination
Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.