Hillcrest West Tentative Tract Map 18553

2 Documents in Project

Summary

SCH Number
2008051132
Lead Agency
City of Barstow
Document Title
Hillcrest West Tentative Tract Map 18553
Document Type
NOD - Notice of Determination
Received
Posted
8/4/2008
Present Land Use
Vacant Zoning: RS-6 Single-family Residential General Plan: Neighborhood Residential (NR)
Document Description
The proposed project is the development of the approximate 69-acre site into 219 single-family residential lots, roadways, and related appurtenances. The project will also include the construction of detention basins at a north central location and the southeast corner of the site. The project is proposed to be developed in six phases, beginning on the southern portion of the site and extending to the eastern, central and western, northern, and western portions of the project site. Roadways and landscaping will be installed in each phase as development occurs. The project also includes the provision of an open space area within the northwestern portion of the project site, which is within the identified FEMA floodplain area. Access to the proposed subdivision would be provided at two locations on the east side of the project from two locations on Jasper Road.

Contact Information

Name
Mike Massimini
Agency Name
City of Barstow
Contact Types
Lead/Public Agency

Location

Cities
Barstow
Counties
San Bernardino
Cross Streets
Jasper Road, near Agate Road
Zip
92311
Total Acres
69
Parcel #
497-143-07, 08; 497-281-02
State Highways
58
Railways
BNSF
Schools
Mojave River
Township
9
Range
2
Section
9
Base
SBB&M

Notice of Determination

Approving Agency
City of Barstow
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.