Kruse Minor Subdivision (2 Lots); TPM 21031RPL1

2 Documents in Project

Summary

SCH Number
2008041095
Lead Agency
San Diego County
Document Title
Kruse Minor Subdivision (2 Lots); TPM 21031RPL1
Document Type
NOD - Notice of Determination
Received
Posted
7/28/2008
Present Land Use
General Plan: (17) Estate Residential Zoning: (A70) Limited Agriculture
Document Description
The proposed project is to subdivide 4.67 gross acres into two residential parcels, ranging in size from 2.01 to 2.10 net acres. Parcel 1 contains an existing single-family residence. The property is located in the Ramona Community Plan Area, and is subject to the General Plan Category of 1.3 Estate Development Area (EDA) and Designation of (17) Estate Residential, which requires 1 du per 2 or 4 acres, depending upon slope. The property is zoned A70 with a minimum lot size of 2 acres. The project will be served by septic and water would be provided by the Ramona Municipal Water District. The applicant will be required to mitigate for impacts to 2.88 acres of interior live oak chaparral.

Contact Information

Name
Kim Sheredy
Agency Name
San Diego County Department of Planning and Land Use
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Handlebar Road and Highland Valley Road (18729 Highland Valley Road)
Total Acres
4.67
Parcel #
283-011-116
State Highways
67
Airports
Ramona
Schools
Ramona Unified
Township
13S
Range
1E
Section
30
Other Location Info
City/Community: Ramona (unincorporated)

Notice of Determination

Approving Agency
County of San Diego Planning Director
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print