UC Merced 2009 Long Range Development Plan

25 Documents in Project

Summary

SCH Number
2008041009
Lead Agency
University of California, Merced
Document Title
UC Merced 2009 Long Range Development Plan
Document Type
NOD - Notice of Determination
Received
Posted
7/3/2009
Document Description
University of California, Merced will install a solar system consisting of an array of approximately 4,870 ground-mounted solar photovoltaic panels that would generate electricity for use on the UC Merced campus, together with supporting infrastructure such as electrical cabling and connection and safety lighting. The system would be designed to supply 1.12 MW of power to the campus through connections to the existing electrical system. UC Merced will 1) expand the solar site to the north on land in the Phase 3 area designated for academic research; 2) correcting the Final EIS/EIR to reflect the correct capacity of the Project as 1.12 MW of power rather than 21 MW of power as stated in the Final EIS/EIR; and, 3) screening the site with fencing rather than landscaping that would partially screen the panels from view from surrounding areas.

Contact Information

Name
Brad Samuelson
Agency Name
University of California, Merced
Contact Types
Lead/Public Agency

Location

Cities
Merced
Counties
Merced
Cross Streets
Yosemite Avenue at Lake Road
Zip
95343
State Highways
SR140
Schools
UC Merced
Waterways
Le Grand Canal, Fairfield Canal

Notice of Determination

Approving Agency
University of California, Merced
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print